Built For

Floor to wall, one manufacturer.

The complete floor-to-wall system for new construction — drain, curb and coating, or any one alone.

Complete Floor System Inspector-Ready Single Source, Coordinated Ship
Coordinated Construction

Three things change when one manufacturer builds the floor.

New construction means every trade's timeline has to line up before the concrete cures. Here's what changes when drain, curb, and coating come from one manufacturer instead of three.

Cost

Save on cost

One manufacturer unlocks volume pricing most GCs can't get buying separately — plus one consolidated shipment instead of freight from three vendors.

Lead Time

Save on lead time

A single coordinated ship date instead of chasing three suppliers' schedules. One manufacturer means one point of accountability for the timeline, not three chances for something to slip.

Hygiene

Maximize hygiene

Most hygienic failures happen at the joint — drain to floor, floor to curb. Mixed manufacturers make those transitions guesswork. We engineer ours to fit each other from spec, closing the gaps where bacteria collect.

How We Work

Specified together or on their own — your call.

Every DELC line is fully certified as a standalone product — HygieniDrain doesn't require HygieniCurb, HygieniCurb doesn't require our coating partner. Our drains spec cleanly against any system on the market. The complete floor-to-wall package is a choice, not a condition of the sale.

Standalone Certified
Each line meets spec alone, inspector-ready
Compatible by Design
Specs cleanly against other manufacturers
Complete System
Optional, never required
Single Point of Contact
One team if you choose the full package
Ready When You Are

Already know what your project needs?

Send your floor plan or spec and we'll turn around pricing and lead time — or book time with a drainage expert directly.

Spec Recommender

Not sure what to start with?

Answer a few quick questions and get a starting recommendation — not a substitute for a real spec conversation, but a fast way to know what to ask for.

1 · Who are you?
Expert
General Contractor
Plumber
Floor Installer
Owner
Ready to Spec?

Ready to spec your new build?

Send your floor plan or facility details and we'll turn around a spec-ready quote — or book time with a drainage expert first.