Application

Engineered for the volume a brew day puts through the floor.

Brewery and beverage drainage sized to move real volume without backing up mid-run.

High-Flow Trench Capacity Sugar & Syrup Resistant Inspector-Ready
Trusted By

Companies we've worked with.

The Industry

It's not washdown — it's volume.

A brew day or bottling run moves a lot of water fast, often with sugar, syrup, or CO2 mixed in. A drain sized for occasional washdown backs up under that load; a drain sized for volume keeps production moving.

1

High-volume rinse and CIP cycles

2

Sugar and syrup residue that's sticky and slow to clear

3

CO2 exposure and humidity in production areas

4

Standing water that slows bottling or packaging lines

Why DELC

Sized for volume, not just washdown.

The TD Series open-top trench profile is built for exactly this flow — high volume, moving fast, without the bottleneck a narrower drain creates. Fully welded 304L/316L stainless resists the corrosion sugar residue and CO2-heavy air accelerate.

High-Flow Capacity
Open-top trench profile for volume
Corrosion Resistant
Holds up to sugar residue and humidity
Fully Welded
No joints for syrup to collect in
Fast Drainage
Keeps production floors clear
Recommended for Beverage & Brewery

Where to start.

HygieniDrain

TD Series — Trench Drains

Open-top capacity built to move high volume during bottling and brew-day rinse cycles.

HygieniDrain

FD Series — Area Drains

Point drainage for equipment pads and packaging line spot drainage.

HygieniCrete

Floor Coating System

Chemically resistant coating built for sugar, syrup, and CO2-heavy production floors.

From the Field
"When we built our brewery in a forty-year-old dairy parlour, we reached out to DELC Drains for drainage solutions. The expertise that they applied to our existing space was fantastic."
— Andrew Hamer, Co-Founder of Locality Brewing
Facility TypeBrewery, Retrofit into Former Dairy Parlour
SeriesHygieniDrain
ScopeDrainage for an existing, repurposed space
ResultFantastic fit to a forty-year-old building
Ready to Spec?

Ready to spec your production floor?

Send your floor plan or facility details and we'll turn around a spec-ready quote — or book time with a drainage expert first.