The connections that hold it together.

Stainless P-traps, hub drains and cleanouts — the fittings that complete a HygieniDrain system.

Applications

The small parts a system can't run without.

P-Traps connect catch basins to the building line and block sewer gas. Hub drains step a wide inlet down to a smaller outlet pipe. Cleanouts give you a sealed access point for clearing a line. All three ship in stainless, sized to your run.

Stainless steel P-Trap

Stainless P-Trap

The connector piece between a catch basin or floor drain and the building's drain line — blocks sewer gas and keeps solids from entering the lines.

MaterialSch10, 304L Stainless
Size4″ standard (custom available)
ConnectionFernco or equal — not welded
Used WithSD/TD catch basins & FD Series
Stainless steel hub drain

Stainless Hub Drain

A shop-welded reducer fitting that steps down from a wide inlet to a smaller outlet pipe, sized to match your line.

MaterialType 304L Stainless Steel
Sizes3″/2″ up to 8″/4″ inlet/outlet
ConstructionFully shop-welded
Overall Height9″ to 12″, by size
Stainless steel cleanout

Stainless Cleanout

A heavy stainless access point for clearing blockages in underground lines, with an air- and water-tight cover seal.

MaterialT304L or T316L Stainless
Cover Plate6″ or custom, 3/8″ SS
Load ClassClass E — Forklift Rated
Seal1/8″ EPDM gasket, air-tight
Why It's Superior

Every connection point, not just the channel.

A drain system is only as good as its weakest fitting. We stainless-spec the P-Traps, hub drains, and cleanouts too — no cast-iron or PVC hiding downstream of a fully welded run. Sized and supplied to match your SD, TD, or FD Series order.

Fully Stainless
304L/316L throughout, no PVC transitions
Sized to Match
Cut to your SD/TD/FD spec
Air-Tight Seals
EPDM gasket cleanout covers
Load Class E
Forklift rated where installed in traffic
Choosing the Right Fitting

Where each one fits.

P-TrapCatch basin & floor drain connections, sewer gas block
Hub DrainStepping down pipe diameter on a run
CleanoutSealed access point for clearing blockages
Case Studies

Proven on the floor, not just on paper.

Ready to Spec?

Ready to complete the system?

Send your floor plan or facility details and we'll turn around a spec-ready quote — or book time with a drainage expert first.