Learning Room

Stainless vs. cast iron floor drains.

Stainless against cast iron, PVC and aluminium — by the people who have replaced all three.

Why this comparison exists

Most drain failures are decided at material selection.

By the time a drain is rusting, cracking, or failing a swab, the decision was made years earlier — usually on price per foot. Here's the comparison we walk plant experts through before they spec.

Category by Category

Compare the materials.

Select a material to compare against DELC HygieniDrain.

DELC HygieniDrain
Cast Iron
Corrosion & Chemical Resistance
304L/316L stainless — resists CIP acids, caustics, and sanitizers indefinitely
Seams & Joints
Fully welded, zero seams or gaskets
Hygiene / Bacteria Harborage
Smooth, non-porous interior — nowhere for bacteria to collect
Load Rating
Load Class E — rated for forklift and cart traffic
Inspector Compliance
Approved out of the box
Typical Lifespan
40+ years — our first 1976 install is still in service
Maintenance
Low — inspect and clean without disassembly
General material comparison based on typical published properties — individual products vary. Not a substitute for a real spec review.
The Honest Version

Stainless costs more up front. That's the whole trade.

Cast iron and PVC are cheaper per foot on day one, and for a low-traffic, low-washdown room that may be enough. The case for stainless is year eight — cast iron rusting at the joints, PVC deformed under a pallet jack, the drain cut out of a floor you already paid to coat. If your plant washes down daily, that day arrives.

Buy stainless when
Daily washdown, CIP, forklift traffic, inspected zones
You may not need it when
Dry rooms, light duty, no sanitation regime
The real cost
Replacement means cutting the floor, not just the drain
Our position
We'll tell you if you don't need us
Not Sure Yet?

Send us the room, we'll tell you what it needs.

Describe the washdown regime and the traffic and we'll give you a straight answer — including when a cheaper material would do.

Standard lead time 6–8 weeks · Expedited available