Why slope is the spec everyone forgets to check.

A perfectly welded drain still fails if the slope is wrong — and slope is invisible until it does.

The Overlooked Spec

A drain is only as good as the floor around it.

Most "failed drain" calls are actually a slope problem — standing water, slow drainage, pooling at the far end of a run. Slope is set once, during the pour, which is what makes it expensive to fix later.

General Planning Ranges

What to check before the pour.

These are planning ranges to guide a conversation with your expert — not a substitute for a stamped hydraulic calculation or a check against your local plumbing code.

Floor Slope to DrainCommonly 1–2% toward the drain — confirm against local code and facility use
HygieniDrain TD Series Internal Slope1.5%, welded in at manufacture
Run Length Before an Additional OutletDepends on pipe size and expected flow — a hydraulic calculation, not a rule of thumb
Most Common Failure ModeSlope measured correctly at install, not verified after slab settling
Where Slope Gets Lost

Three ways a correct spec still ends up wrong on the floor.

1

Slope specified on paper but not verified by the flooring crew during the pour

2

A long run with no secondary outlet, so the far end never fully clears

3

Slab settling after months of forklift traffic, flattening the slope near the drain

4

A retrofit drain set into an existing floor that was never sloped correctly to begin with

The Honest Version

We won't give you a number that's wrong for your floor.

Real slope and sizing depends on your flow volume, pipe capacity, run length, and local plumbing code — not a general guide. We'll walk your floor plan with you before the pour, when a slope correction costs a conversation instead of a torn-up floor.

Before the Pour
Send the floor plan for a slope review
Retrofit
We check existing slope before quoting
New Build
Specified alongside drain, curb & coating
Our Position
A slope calc is part of the quote, not extra
Not Sure Yet?

Get your floor plan reviewed before the pour.

Send your layout and flow estimate and we'll walk through slope and sizing with you — it's far cheaper to fix on paper than in concrete.